Section 09 of 12 / Test the decision

Scorecard

Evaluate competing proposals against common evidence, weighted criteria and mandatory conditions.

Pages
10
Sources cited
6
Last updated
24 November 2026
Graduated calibration weights beside a precision balance.

Compare three delivery options

Score suppliers and the internal plan on the same workflow. Record each condition for live use before comparing weighted ratings.

Decision weights

100 / 100
Outcome and baseline15%
Quality on buyer cases20%
Cost and downside15%
Data rights and controls15%
Integration and staffing10%
Operations and recovery10%
Portability and terms10%
Delivery evidence and interests5%

Freeze weights before opening bids. A change of scope needs a new sheet and fresh ratings.

What the 0–4 ratings mean
  1. 0Missing evidence, a failed mandatory requirement or a material contradiction.
  2. 1An assertion or incomplete proposal.
  3. 2Documented for the intended design with an important untested dependency.
  4. 3Shown on relevant evidence with a bounded, owned gap.
  5. 4Meets the strong-evidence description and the buyer can verify the result.

Option to edit

Common test
Mandatory conditions for live use
Documented authority for the actual data flow
Gate record
Gate record
Gate record
An acceptable test against the buyer’s severe-error limit
Gate record
Gate record
Gate record
A working fallback with a responsible operator
Gate record
Gate record
Gate record
Scored criterionWeight %Option 1Option 2Option 3
Outcome and baseline
Evidence to request

Sample of accepted cases and existing cost or approved commercial baseline.

Record evidence
Record evidence
Record evidence
Quality on buyer cases
Evidence to request

Blind replay with routine, difficult and abstention cases.

Record evidence
Record evidence
Record evidence
Cost and downside
Evidence to request

Quote, resource schedule and sample invoice under adverse mix.

Record evidence
Record evidence
Record evidence
Data rights and controls
Evidence to request

Data map, applicable agreements and configuration evidence.

Record evidence
Record evidence
Record evidence
Integration and staffing
Evidence to request

Walkthrough on one real dependency and written owner acceptance.

Record evidence
Record evidence
Record evidence
Operations and recovery
Evidence to request

Rehearse failure, recovery and backlog clearance.

Record evidence
Record evidence
Record evidence
Portability and terms
Evidence to request

Export sample and buyer-operated handover.

Record evidence
Record evidence
Record evidence
Delivery evidence and interests
Evidence to request

Reference interview or internal service-owner review; follow-on fee statement.

Record evidence
Record evidence
Record evidence

Comparison results

Option 1

0.0 / 100

Band thresholds · 50 / 70 / 85

Awaiting a rating

0 of 8 criteria with an evidence reference · 0 rated

Mandatory evidence outstanding3 of 3 gates not demonstrated.

Option 2

0.0 / 100

Band thresholds · 50 / 70 / 85

Awaiting a rating

0 of 8 criteria with an evidence reference · 0 rated

Mandatory evidence outstanding3 of 3 gates not demonstrated.

Option 3

0.0 / 100

Band thresholds · 50 / 70 / 85

Awaiting a rating

0 of 8 criteria with an evidence reference · 0 rated

Mandatory evidence outstanding3 of 3 gates not demonstrated.

Unrated criteria contribute zero. Evidence coverage counts criteria with a recorded reference. A mandatory condition takes precedence over the numerical band.

Your entries stay in this browser. Download a dated copy before changing the scope.

Weights and cutoffs are editorial and have not been back-tested on procurement outcomes. Read the scoring method →

In this section

10 research pages
  1. 01

    What goes on every bid sheet?

    Give all bidders and the internal team the same workflow, permitted inputs, volume profile, expected final state, deadline and money ceiling.

    Read →
  2. 02

    What should count most?

    Weight each criterion and ask for the test or document that distinguishes strong evidence from a weak claim.

    Read →
  3. 03

    How is the score calculated?

    Rate each criterion from 0 to 4.

    Read →
  4. 04

    Which conditions override a high score?

    Before live use, require documented authority for the actual data flow, an acceptable test against the buyer’s severe-error limit, and a working fallback with a responsible operator.

    Read →
  5. 05

    How would we handle a close result?

    Use the worked ratings for a configured product and an internal hybrid to see what could change a close result.

    Read →
  6. 06

    What should a reference call establish?

    Ask which part reached production, who supplied the data, what the buyer’s team did, which milestone slipped, what changed at renewal and whether they could operate the product after handover.

    Read →
  7. 07

    Frequently asked questions

    How should we score a promised capability?

    Read →
  8. 08

    Gaps for the next research pass

    Weights and cutoffs are editorial and have not been back-tested on procurement outcomes.

    Read →
  9. 09

    Editorial assessment

    Anchored criteria, repeatable arithmetic and override rules make the score auditable.

    Read →
  10. 10

    Sources

    Open the 6 references cited in this section.

    Read →

Reference

Frequently asked questions →

Answers to recurring buyer questions.

What remains unproven →

Evidence still missing for this decision.

Research limitations →

How the desk assessed the evidence.

Sources →

The documents cited in this section.

Research quality

The desk’s assessment, out of 10.

Buyer fit
9/10
Depth
9/10
Search terms
9/10
Sources
8/10